Pebsteel Philippines specializes in Design and Supply for Pre-engineered Buildings and Structural Steel.

1994

established

50+

countries we served

12

regional sales offices

100+

in-house engineers

Japanese Shareholders

OKAYA & CO., LTD.

NIPPON STEEL

Founded in Europe alongside Japanese shareholders, Pebsteel operates in 12 regional sales offices and has its main headquarters in Vietnam.

Our team is 1,400+ strong, made up of certified engineers and dedicated business personnel with a deep understanding of our customers’ needs.

What we do

We at Pebsteel are committed to providing our customers with world-class service through all stages of the process. From design to fabrication, erection, and post-sales assistance, we are there for you every step of the way.

System

We provide building solutions for Pre-engineered Buildings and Structural Steel.

Projects

We proudly serve customers in all industries on projects of all scales.

History in the making

dark-slide-image

1994

PEB Steel Buildings Co., Ltd. first established in Vietnam

dark-slide-image

1999

First office in Thailand marks expansion into Indochina

dark-slide-image

2004

The first modern factory in Vietnam with two automatic welding lines

dark-slide-image

2006

Established Vietnam’s second factory, along with a joint venture in Bangladesh

dark-slide-image

2007

The first long-term joint venture in India

dark-slide-image

2008

Established a representative office in Myanmar

dark-slide-image

2009

Nippon Steel and Okaya & Co., Ltd. became shareholders in Pebsteel. Third factory built in Vietnam

dark-slide-image

2010

Established a representative office in Cambodia

dark-slide-image

2011

Established a representative office in the Philippines

dark-slide-image

2011

Completion of the 4th factory in Vietnam

dark-slide-image

2012

Established a representative office in Indonesia

dark-slide-image

2014

Completion of the 5th factory in Vietnam

dark-slide-image

2016

Completion of the 6th factory in Vietnam

dark-slide-image

2017

Production expanded to Myanmar along with the opening of new factory

dark-slide-image

2020

Official launch of the Structural Steel Division to increase our offerings in the Steel Buildings sector

dark-slide-image

2022

Refresh our brand identity for business expansion to new international markets

Our vision

We empower people and businesses through better engineered spaces.

Our mission

Our goal is to become the benchmark in the steel building industry, through innovative, safe, and sustainable solutions.

Our values

Effective solutions

  • Continuous innovative design of new systems, technology, services and processes tailored to the customer’s needs.
  • Optimization and updating of current solutions to ensure maximum efficiency and benefits for all customers.

Dynamic teamwork

  • Our highly specialized team provides the customer with a personalized experience.
  • A well-oiled machine, our experienced workforce eliminates customer stress.

Committed partnerships

  • We maintain customer support through every stage of the process. Our support does not expire. We maintain permanent loyalty to our customers.
  • At Pebsteel, integrity is of paramount importance. We are transparent and honest, and dedicated to the success of all customers, shareholders, and stakeholders.

Our people

Undeterred by global challenges, Pebsteel has continued to expand across Southeast Asia and beyond, thanks to the leadership of Sami Kteily and Adib Kouteili.

Strong proponents of diversity and equality, we are proud to work with partners and staff from all walks of life.

Founders

SAMI Kteily

Executive Chairman

Sami Kteily was first to seize the opportunity to bring the revolutionary technology of pre-engineered buildings to Vietnam in 1994.

ADIB Kouteili

Co-Founder & Director

With nearly 40 years of experience in sales and in the construction industry, Adib Kouteili cares deeply about customer satisfaction through efficient teamwork, and operates on the firm belief that nothing is impossible.

Board of Management

The team

Standing by to serve

With six factories in Vietnam and one in Myanmar boosting a total capacity to 100,000+ MT / year, Pebsteel maintains an inventory of 15,000MT of steel ready to go, allowing for a prompt start to any project.

Factory 1

The first Pebsteel factory is designed in the “I” shape to maximize unobstructed internal production flow. It is equipped with fully automated submerged arc welding lines from Lincoln (USA).

Factory 2

The building displays excellence and innovation in every piece of engineering. It is 17 meters high with a 4:10 slope and is supported by Pebsteel’s castellated beams and open-web-joists system.

The roof is fitted with our special LokSeam® profile – the optimal choice to prevent water leak.

 

Factory 3

This factory is equipped to produce both pre-engineered building structures and heavy structures, including hot-rolled members for power plants, oil & gas facilities, multi-storey/high-rise buildings, and other special steel structures.

 

Factory 4

The 4th factory is specialized in a unique design with a wide bay spacing of up to 15 meters without jack beam support.

Pebsteel uses huge size Z300 purlins which are made of Silver180® coated steel (AZ180 Gr/M2). This material is ideal for intensive corrosion resistance.

Factory 5

The first factory to use our special rigid frame PebHybrid®, which can shorten fabricating time and extend the construction life cycle.

The special insulation material PebInsul™ and great ridge ventilation system help to make the interior space cooler and more comfortable. PebWall® and PebLiner™ were chosen for the cladding to enhance the aesthetic of the entire factory.

Factory 6

The 6th plant is more invested in advanced machine systems to produce heavy steel structures for complex structures. Pebsteel applies the latest technical innovation in the pre-engineered buildings industry to the ridge ventilation system, as well as using high-performance PebFoam™ in thermal insulation and PebHybrid® for rigid frames and mezzanine joists.

Factory 7

Located in the Thilawa Special Economic Zone, Pebsteel’s factory in Myanmar commits a total fabricating capacity of up to 30,000 MT per year. This large 30,000-square-meter factory and state-of-the-art machinery systems can handle heavy steel structures to quickly meet the toughest demands set by complex structures. The new facility is built with the latest products and technologies from Pebsteel: PebHybrid® for rigid frames and mezzanine joists; modern insulation and ridge ventilation systems; and environmentally friendly paint.

logo-switcher

Local websites

Philippines

Cambodia

Thailand

Myanmar

Indonesia

Global website

Learn all about Pebsteel, our worldwide solutions and projects.

Global website
logo

Global website

Learn all about Pebsteel, our worldwide solutions and projects.

Global website